Citation
Ammar Azmi (2015) Change of work order as a delay factor: A case study of building construction in Kelantan, Malaysia. Masters thesis, Universiti Malaysia Kelantan. |
Abstract
This study recommends measures to address the change of work order issues that can be executed on two different phases of the project, before and during construction phase. Pre-planning can be applied before construction starts and can reduce the risk of delay if done right. |
Download File / URL
Full text not available from this repository.
|
Additional Metadata
| Item Type: | MBA/DBA Final Project Report |
|---|---|
| Collection Type: | Thesis |
| Date: | 2015 |
| Subject Heading: | Risk management |
| Supervisor: | Dr. Razli Che Razak |
| Programme: | Malaysian Graduate School of Entrepreneurship and Business |
| Institution: | Universiti Malaysia Kelantan |
| URI: | http://discol.umk.edu.my/id/eprint/78 |
| Statistic Details: | View Download Statistic |